September 6, 2014 Workday

About 13 volunteers worked on the Saturday, September 6th workday! After the safety briefing, the group disassembled the old cemetery fence and then installed the replacement cedar posts. First the layout was measured, and then the 8 vertical posts were placed. On a future workday, the rough sawn stringer boards, donated by the Conservation Camp, will be attached as will the 1″ by 4″ pickets. The hand tool lopping of very small firs and dead locust trees around the cemetery makes the area look nicer and less cluttered.